Early feasibility
Review the site, waterway, access, loading needs and programme before temporary works and logistics become fixed.
Discuss a project ↗Construction & civil engineering
WHH provides marine construction support on canals and navigable rivers, combining floating access, crane and HIAB barges, work platforms, lifting capability and practical waterway experience for constrained sites.
Marine construction support
The answer is rarely a single boat.
Construction beside a live waterway can require stable access, lifting, materials handling, safety cover, welfare, navigation management and reliable mobilisation to work as one operation. WHH brings those elements together around the project method and programme.
We can join the team during feasibility or preconstruction, develop the marine configuration and then supply the craft, equipment and people needed for delivery.

Heavy work in restricted places
At Lisson Grove, a combination of vessels and equipment provided the platform, reach and stability needed for piling where conventional land-side access was constrained. The arrangement allowed plant and steelwork to be handled from the canal while retaining a practical work area for the operation.
Shown: piling operation at Lisson Grove, London
How we support the project
Tell us what has to be built, lifted, reached or moved. We will help translate that requirement into a practical marine setup.
Review the site, waterway, access, loading needs and programme before temporary works and logistics become fixed.
Select and combine craft, pontoons, lifting equipment, access arrangements and support boats around the task.
Plan routes, assembly, loading points, interfaces and the sequence needed to establish the required vessels and equipment.
Provide maintained equipment and experienced crews who understand construction sites as well as waterways.


Typical applications
Involve us early
You do not need to specify the craft. Send us the site, drawings, programme and what the operation needs to achieve; we will help identify the practical marine solution and the allowances it requires.
Discuss a construction project ↗