Selected projects

Constraints made
workable.

Examples of WHH combining vessels, equipment, people and methodology to deliver engineering, logistics and maintenance work on the inland waterways.

A growing project library

Proof across
different operations.

Selected examples of how WHH combines craft, plant, crews and practical methodology around the needs of each operation.

Utilities & towpath

Murphy cable replacement works

A moving floating worksite combining specialist cable-handling plant, storage, welfare and marine logistics along a constrained live towpath.

Read the case study

Freight & construction logistics

London basement waste by barge

Around 700 tonnes of excavated material moved from a Camden garden to a canalside recycling facility in 35 barge loads.

Read the case study

Utilities & towpath

River Lee electricity poles

A barge-mounted auger and HIAB delivered, installed and removed poles where road-based plant could not reach the towpath.

Read the case study

Freight & logistics

Regent's Wharf muck away

Approximately 3,500 tonnes of piling arisings removed in fewer than 75 barge loads for Byrne Bros.

Explore the capability

Bridges & bespoke engineering

Paddington Rolling Bridge

A ballasted pontoon and bespoke turntable lifted, rotated and carried the complete bridge away by water for hydraulic repairs.

Read the case study

Waterway maintenance

Lock gate replacement with Jumbo

Twin cranes allowed both ends of a drained lock to be served from one stable specialist barge position.

Read the case study

Bridges & temporary works

Northern Outfall Sewer Bridge

Removable screw-pile temporary works developed around soft tidal ground, restricted access and low headroom.

Read the case study

Marine construction

Repton Street mooring works

Configured vessels and lifting support for construction within a restricted urban canal corridor.

Explore the capability

Scheduled freight

Camden Market waste by water

A barge connected the market's Interchange dock to a canalside recycling facility without a road leg at either end.

Read the case study

Bridges & access

South Park Gardens

A dynamic combination of pontoons and crane boat supported bridge scaffolding while retaining navigation and towpath access.

Explore the capability

Waterway & waterspace management

Carpenters Road Lock

Dudley provided lifting capacity for stop-plank handling within the constrained Olympic Park lock site.

Explore the capability

A similar constraint?

Start with what the project must achieve.

We can help test whether the waterway offers a practical route, work platform or logistics solution before the programme and access strategy are fixed.

Discuss your project