Selected projects

Constraints made
workable.

Examples of WHH combining vessels, equipment, people and methodology to deliver engineering, logistics and maintenance work on the inland waterways.

A growing project library

Proof across
different operations.

Selected examples of how WHH combines craft, plant, crews and practical methodology around the needs of each operation.

Utilities & towpath

Murphy cable replacement works

A moving floating worksite combining specialist cable-handling plant, storage, welfare and marine logistics along a constrained live towpath.

Read the case study →

Freight & construction logistics

London basement waste by barge

Around 700 tonnes of excavated material moved from a Camden garden to a canalside recycling facility in 35 barge loads.

Read the case study →

Utilities & towpath

River Lee electricity poles

A barge-mounted auger and HIAB delivered, installed and removed poles where road-based plant could not reach the towpath.

Read the case study →

Freight & logistics

Regent's Wharf muck away

Approximately 3,500 tonnes of piling arisings removed in fewer than 75 barge loads for Byrne Bros.

Explore the capability →

Bridges & bespoke engineering

Paddington Rolling Bridge

A ballasted pontoon and bespoke turntable lifted, rotated and carried the complete bridge away by water for hydraulic repairs.

Read the case study →

Waterway maintenance

Lock gate replacement with Jumbo

Twin cranes allowed both ends of a drained lock to be served from one stable specialist barge position.

Read the case study →

Bridges & temporary works

Northern Outfall Sewer Bridge

Removable screw-pile temporary works developed around soft tidal ground, restricted access and low headroom.

Read the case study →

Marine construction

Repton Street mooring works

Configured vessels and lifting support for construction within a restricted urban canal corridor.

Explore the capability →

Scheduled freight

Camden Market waste by water

A barge connected the market's Interchange dock to a canalside recycling facility without a road leg at either end.

Read the case study →

Bridges & access

South Park Gardens

A dynamic combination of pontoons and crane boat supported bridge scaffolding while retaining navigation and towpath access.

Explore the capability →

Waterway & waterspace management

Carpenters Road Lock

Dudley provided lifting capacity for stop-plank handling within the constrained Olympic Park lock site.

Explore the capability →

A similar constraint?

Start with what the project must achieve.

We can help test whether the waterway offers a practical route, work platform or logistics solution before the programme and access strategy are fixed.

Discuss your project ↗